Canadian Entertainment Project Case Study

Project Information

Location: Alberta, Canada
Period: October 2023
Contract Value: Approx. RMB 43,000

Project Challenge

The traditional reinforced concrete foundation for swimming pool entertainment facilities requires multiple stages: excavation, formwork, rebar binding, pre-embedding, pouring, and curing—making the process complex and time-consuming.
During conventional foundation construction, other entertainment facilities cannot be used, resulting in downtime and disruption.
High cost, long construction period, and difficult execution of concrete foundations have been long-standing challenges for developers.

Our Solution

Recommended the technical parameters for the helical pile foundation of this project’s swimming pool entertainment facilities.
Proposed a helical pile construction scheme, where subsequent processes can begin immediately after installation, ensuring fast and efficient progress.
Manufactured and supplied all required helical piles for the project.
Provided on-site construction guidance services.

Project Results & Benefits

Uninterrupted Operations: Helical pile foundation construction did not affect the use of other entertainment facilities.
Cost Optimization: By producing and supplying helical piles from Structured, the project’s foundation cost was reduced by approximately 30%.
Efficiency Gains: Construction was significantly faster, allowing immediate transition to subsequent work stages.
Value-added Services: Free technical consulting for pile foundation design and free construction guidance were provided.